Handling at site stores / storage yard as per bill of materials.
|
 | Examining for damages if any and preparing the Report for the same.
|
 | Transportation required Materials / Equipments to the work site.
|
 |
Designing the Electrical scheme and Detailed Engineering upto 33KV.
|
 |
Preparation and submission of scheme drawing for approval.
|
 |
Preparing Specification, Procurement and Supply of Equipments / Transformer / LT & HT Switch Gear / MCCs & PDBs / Cable Tray etc.
|
 |
Design, Fabrication, Supply, Erection and Commissioning of Flood light Towers.
|
 |
Laying of Control & Power Cable including XLPE Cable, Dressing, Glanding & Termination (upto 33 KV)
|
 |
Erection of Sub-Station Equipments / Transformer / LT & HT Switch Gear / MCCs & PDBs / Cable Tray, etc. as per drawings.
|
 |
Supply of wires, Light fitting, Installation, point wiring and internal electrification of large industrial complex.
|
 |
Calibration of all Instruments and preparing the Test Reports.
|
 |
Installation of Calibrated Instruments.
|
 |
Pre-Commissioning test of all Transformers including Transformer oil Filtration.
|
 |
Pre - commissioning testing for the Electrical scheme including Sub-Station Equipments / LT & HT Switch Gear / MCCs & PDBs / Cable etc. in sequence.
|
 |
Commissioning of all Equipments / Systems in co-ordination with End Customer.
|
 |
Preparing Commissioning Reports and submitting the same to the Customer.
|
 |
Offering Technical supports during Trial operations.
|
 |
Performance Test to verify the design parameters.
|
 |
Preparation and submission of Electrical Drawings with completion reports for approval from C.E.I.G.
|
 |
Co-ordination with Electrical Inspectorate, for approval & safety certification from C.E.I.G. (upto 33KV).
|