OIL & GAS PROJECTS:

  • Instrumentation work at LLDPE - Reliance Industries Ltd., Jamnagar.
  • OFF Shore & YARD Project: Electrical & Instrumentation work on NLM Platform (MAIN DECK & HELIDECK)  at MDL, Mangalore Yard.
  • Electrical & Instrumentation work for Mazagon Dock Ltd., DECK Project at Mangalore (EIL Consultant).
  • LPG PLANT: Sphere Control and Instrumentation Work at CBE LPG Plant at Coimbatore through Bharat Petroleum Corporation Limited. (BPCL)
  • LPG STORAGE : LPG Storage plant Instrumentation erection work at SPIC, Tuticorin
  • CCK PIPELINE PROJECT: Erection, Testing and Commissioning of Instrumentation field work for CCK Pipeline project for PETRONET CCK LIMITED through Dodsal at Irugur / Coimbatore and Karur .
  • VACCUM GAS OIL (Petroleum Refinery project) Erection, Testing , Loop checking and
    commissioning of Instrumentation job at VGO 3 & 4 (VACUM GAS OIL MAIN PLANT & VGO- 4 )at
    RELIANCE PETROLEUM LILMITED, Jamnagar Project.
  • TERMINAL AUTOMATION PROJECT: Supply, erection ,testing & commissioning including civil work
    trenchs, Excavation, Soil providing , river sand ,Brick, etc for  Terminal Automation Project
    at Bharat Petroleum Corporation Limited through Invensys-Foxboro/APV/IBS.
  • DE-HYDRO-DE-SULPURIC-DHDS,ETP,FIREDHEATOR-FH: Control and Instrumentation erection ,
    testing ,loop checking & commissioning of DHDS, ETP, FIRED HEATOR, HYDROGEN, OXYGEN& OFFSITE
    UTILITIES ( ALL TANK FARMS) AT HINDUSTAN PETROLEUM CORPORATION LIMITED, VIZAG REFINARY, VISAGAPATTINAM, AP. through L&T .
  • SRU PLANT : Control and Instrumentation erection , testing ,loop checking & commissioning of
    SULPURIC PLANT AT CHENNAI PETROLEUM CORPORATION LTD.,
  • ATF Tank farm facility, Partial Engg., Procurement, supply, Erection & Commissioning
    (Including ATF-FUEL-Truck off loading Gantry, Hydrant pump, U/GTank, Dispenser/Refueller, etc.,) INTERNATIONAL AIRPORT GMR Hyderabad through M/s. IMC.
  • Instrumentation erection & Commissioning work for Gas cracker & HDPE Project at Indian
    Petrochemical Corporation Ltd.,, Kandar, Dehej, Gujarat.
  • Instrumentation Erection & Commissioning work for TPH HRSG at Panipat Refinery – Indian Oil
    Corporation Ltd., Panipat Haryana.
  • Instrumentation Erection work at BPCL, Cochin through Tata Honeywell.
  • TAMILNADU PETROPRODUCTS LIMITED: Erection, Testing and Commissioning of Instrumentation
    field work FOR MOBCAT PILOT PLANT PROJECT at Tamilnadu Petroproducts Limited, Manali,  Chennai.
  • BULLETS Plants: Removal of existing tube, Supply, erection, testing & commissioning of
    C&I work for Bullets A & B at Tamilnadu Petroproducts Limited, Cuddalore.
  • PROPYLENE STORAGE: Instrumentation erection work for Propylene storage project at
    Tamilnadu Petroproducts Limited, Cuddalore Port, Tamilnadu.
  • AMMONIA & UREA PROJECT: C&I Erection, testing & commissioning work for AMMONIA& UREA
    Project at Madras Fertilizer Limited. Manali,  Madras,  Through Honywell.
  • AMMONIA PLANT REVAMP: Erection, testing & commissioning of instrumentation work for
    K1603 compressor area at ammonia revamp plant at Madras Fertilizer Limited. Manali,
    Madras.
  • OXYGEN PLANT: Instrumentation work at BHORUKA GASES LIMITED(Formerly Karnataka oxygen
    limited),Bangalore.
  • OXYGEN PLANT: C&I erection, testing & commissioning work for 460 MTPD, New Oxygen
    Plant at Sterlite industries, Tuticorin
  • EXPLOSIVE GAS PROJECT: Instrumentation Erection & Commissioning work at TAMILNADU
    INDUSTRIAL EXPLOSIVES LTD.,
  • LIGNITE TEST FURNACE (GAS BASED) Project at NLC, Neyveli through HRL Technology PTY Ltd.,
    Australia.

GAS COMPRESSOR AND GAS BASED POWER PLANT:

  • TNEB - VALUTHUR, TNEB - KUTTALAM,  TNEB – KOVILKALAPPAL, NTPC – KAYAMKULAM,
    NTPC – FARIDABAD, PRAGATHI POWER – NEWDELHI, BASIN BRIDGE GAS TURBINE PROJECT,
    CHENNAI, MADRAS REFINERY LTD., MANALI, MADRAS FERTILIZERS, CHENNAI.

BIOMASS & BAGAUSSE PROJECTS (CO-GEN):

  • EID PARRY - NELLIKUPPAM, EID PARRY – PUGALUR, RAJASHREE SUGARS & CHEMICALS - VILLUPURAM,
    PENNADAM SUGARS, ETC., SYNERGY SHAKTHI RENEWABLE ENERGY LTB.,

CHEMICAL & PETROCHEMICAL, FERTILISERS PROJECTS:

  • Turnkey Instrumentation Contract for CCR Plant Project at Sterlite Industries (India) Ltd.,
    Tuticorin
  • Turnkey Instrumentation Contract for Asian Paints India Ltd., Sriperumbuthur
  • Turnkey Electrical & Instrumentation work at Sellenium Project at Sterlite, Tuticorin.
  • Turnkey Instrumentation Contract for Vanavil Dyes & Chemicals Limited, Cuddalore.
  • I & C Work for IGFC, Birla Copper Project at Bharuch, Gujarat.
  • Turnkey Instrumentation Contract for Shasun Chemicals & Drugs Ltd., Pondicherry.
  • C&I Works for Thirumalai Chemicals Ltd., Ranipet.
  • C&I Works for Chemplast Sanmar Ltd., Mettur & Karaikal.
  • C&I Works for Cabot Sanmar Ltd., Mettur.
  • C&I Works for Origin Agrostar Limited, Cuddalore
  • C&I Works for Hindustan Lever Ltd., Hosur & Pondicherry
  • C & I Works at Chemfab Chlorates ltd.,
  • C & I Works at Indian Organic Chemicals Ltd.,
  • C & I Work at TAMIN through L & T.,
  • C & I Work at Furtura Polymers
  • C & I Work at Balmer & Laurie Ltd.,
  • C & I Work at TamilNadu Chlorine & allied Chemicals.
  • Electrical, C & I Work at Kothari Petrochemicals ltd., Karaikal
  • Electrical , C & I Work at English Indian Clays

PAPER PROJECTS:

  • C&I Works for Tamil Nadu Newsprint & Papers Ltd., Kagithapuram.
  • C&I Works for ITC Bhadrachalam Paper Boards Ltd., Sarapaka, A.P.
  • C&I Works for Hindustan Newsprint & Papers Ltd., Kottayam, Kerala.

SUGAR PLANTS:

  • Electrical and C&I Works for EID Parry India Ltd., Nellikuppam & Pugalur.
  • C&I Works for Arunachalam Sugar Mills Ltd., Tiruvannamalai.
  • Turnkey Instrumentation Contract for Rajshree Sugars and Chemicals Ltd., Mundiyambakkam.
  • Electrical, C & I Work at Kothari Sugars & Chemicals ltd., Karaikal

STEEL & POWER PROJECTS:

  • Erection, Testing, Commissioning of  Electrical and C&I Jobs for Gas Fired Boilers, BPTG, STG, Turbo-Blower,
    BOP, Generator Transformer and their auxilliaries etc for 3 nos 18 MW STG + 1 No. 8.275 MW BPTG + 3 Nos.
    Turbo-Blowers (Each 2,28,600 NM3/HR) Power And Blowing Station at IISCO Steel Plant, Burnpur, Burdwan,
    West Bengal, India.Bharat Heavy Electricals Ltd., PSER, Kolkata.
  • E & C of C & I at 3600 MW Power Plant at Nariyana, Janjgir, Champa, Chattisgarh (Bilaspur), SEPCO 1 China.
  • Controls & Instrumentation Package - Unit 1 & 2 of 2x800 MW set at Yermarus Thermal Power Station,
    Yermarus, Raichur Dist, Karnataka, Bharat Heavy Electricals Ltd., PSSR, Chennai.
  • Controls & Instrumentation Package - Unit 1 & 2 of 2x500 MW set at NTPL - Tuticorin TPP,
    Tuticorin, Tamilnadu.Bharat Heavy Electricals Ltd., PSSR, Chennai.
  • Package C: I&C System for Unit-1 & BOP at Cuddalore 2x600 MW ITPCL Power Plant Project Site,
    Shandong TIEJUN Electric Power Engg. Co. Ltd., L&FS Cuddalore Project Site Office, Cuddalore, Tamil Nadu.
  • Handling at Site Stores / Storage yard and Transportation to Site of work, Pre-assembly, Erection,
    Testing and Commissioning  and handing over of Control & Instrumentation Package including supply &
    application of touch-up, preservation and final painting of above package for Package A of 6 x 150 MW
    sets at Aditya Aluminium Project, Lapanga, Sambalpur district, Odisha.Bharat Heavy Electricals Ltd., Chennai.
  • Erection, Testing, Commissioning etc of  balance C&I System including all max-DNA MMI System for GT,
    STG, HRSG, UB and C&I of balance Systems/Sub-systems with Misc. Field Instruments for 366 MW IOCL
    PARADIP Project. Bharat Heavy Electricals Ltd., PSER, Kolkata.
  • Erection, Testing, Commissioning etc of  balance C&I System including all max-DNA MMI System for GT, STG, HRSG,
    UB and C&I of balance Systems/Sub-systems with Misc. Field Instruments for 366 MW IOCL PARADIP Project.
  • Handling at Site Stores / Storage yard and Transportation to Site of work, Erection, Testing and Commissioning of
    Control & Instrumentation Package for  2 x 250 MW Unit for NLC at Neyveli Thermal Expansion Stage-II, Neyveli,
    Tamil Nadu.Bharat Heavy Electricals Ltd., PSSR, Chennai.
  • 2x660 MW MPPCGL Erection & Commissioning of Electrical & INstrumentation work, Malwa Thermal Power Project.
  • 4 x 500 MW Stage II & III of NTPC at Vindhyachal Super Thermal Power Station, Vindhyachal.
  • 4 x 500 MW of Stage II for NTPC at Talcher Super Thermal Power Plant, Angul, Orissa
  • 1 x 500 MW of NTPC at Ramagundam Super Thermal Power Plant, Ramagundam
  • 1 x 500 MW at Birsinghpur Thermal Power Station, Birsinghpur, Dist. Umaria.
  • 2 x 500 MW at Sipat Thermal Power Station, Stage II, Bilaspur Dist, Chattisgarh.
  • 1 x 350 MW GT at Kayamkulam Combined Cycle Power Plant, Allepey, Kerala
  • 1 x 250 MW at New Parli Thermal Power Station, Parli, Dist. Beed, Maharashtra
  • 2 x 250 MW at Mejia Thermal Power Station, Kolkata
  • 3 x 250 MW at Kothagudam Thermal Power Station, Paloncha, A.P.
  • 1 x 250 MW of Suratgarh Thermal Power Station, Rajasthan.
  • 7 x 210 MW Stage II at Neyveli Lignite Corporation Ltd., Thermal Power Station-I, Neyveli.
  • 2 x 210 MW at Neyveli Lignite Corporation Ltd., Thermal Power Station-I Expansion, Neyveli.
  • 5 x 210 MW of WBSEB at Bakreswar Thermal Power Plant, West Bengal
  • 2 x 210 MW at Ferroz Gandhi Unchahar Thermal Power Station, Unchahar.
  • 3 x 210 MW of KPCL at Raichur Thermal Power Station, Raichur
  • 4 x 210 MW at Vijayawada Thermal Power Station, Vijayawada
  • 2 x 210 MW at Royalaseema Thermal Power Plant, A.P.
  • 1 x 210 MW at Mejia Thermal Power Station, Kolkata
  • 1 x 210 MW at Tuticorin Thermal Power Station, TNEB, Tuticorin.
  • 2 x 110 MW of R&M Project at Ennore Thermal Power Station, Chennai.
  • 1 x 110MW of R & M at GEB, Ukai, Gujarat
  • 1 x 60 MW of Fly Ash Excavation System at Ennore Thermal Power Station, Chennai.
  • 2 x 125 MW Gujarat Industrial Power Corporation Ltd, SLPP, Mangrol, Gujarat
  • 1 x 115 MW 2x180 TPH HRSGs at DVB Pragati Combined Cycle Power Project, Delhi.
  • 1 x 110 MW of Combined Cycle Power Plant, Faridabad, Haryana
  • 1 x 108 MW of Combined Cycle Power Plant (TNEB) at Kovil Kalapal.
  • 1 x 101 MW of Combined Cycle Power Plant at Kuttalam Gas Turbine Power Project Nagapattinam Dist.
  • 1 x 95 MW of Combined Cycle Power Plant at Valuthur Gas Turbine Power Project, Ramnad Dist.
  • 750 mtpd coke calcinations plant port area at RCL-visakhapatnam through M/s.L &T.

DESIGN & ENGINEERING PROJECTS:

  • Design, Engineering, procurement, supply, erection & Commissioning of BOP package C & I work inclusive of PLC for 1000mw(4 x 250MW) Coal based Power Project at Jindal Power Limited, Tamnar, Raigarh, India.
  • Design, Engineering, procurement, supply, erection & Commissioning of Water batch Plant
    project at DOW International Chemicals Ltd., Chennai, India.
  • Design, Engineering & procurement AT Vanavil Dyes & Chemicals Ltd., Cuddalore.
  • Engineering work for Hindustan Newprint papers Ltd., Piravam, Kottayam, Kerala.
  • Engineering work for Kerala Metal & Mineral Ltd., Kollam, Kerala.
  • Engineering work for Shasun Chemicals & Drugs Ltd., Chennai.
  • Partial Engineering, Supply, Erection & Commissioning at Tanfac, Cuddalore.
  • Engineering, Supply, Erection & Commissioning work for Defence Projects.

AUTOMOBILES SECTOR:

  • Turnkey Instrumentation / Electrical contract for Hyundai Motors India Limited through DURR, Germany

MANUFACTURING SECTOR:

  • M/s. DRDO-Defence Research and Development Organization.
    Design, Manufacturing and Supply of Pressure Curing System with Surge Tank.Turnkey Instrumentation / Electrical contract for Hyundai Motors India Limited through DURR, Germany.
  • M/s. Bharat Heavy Electricals Ltd., EDN, Bangalore.
    Design, Manufacturing and Supply of Operator Desk for Anpara D Project.
  • M/s. L&T - MHI Boilers Pvt. Ltd., Faridabad.
    Supply of Electrical Equipments and LIE/LIR at 2 x700 MW Rajpura Thermal Power Project.
  • M/s. Larsen & Toubro Ltd., EBG, Mumbai.
    Design,Manufacturing and Supply of LIR & Terminal Boxes.
  • M/s. VATech Wabag.
    Design,Manufacturing and Supply of Purge Panel.
  • M/s. Bharat Heavy Electricals Ltd., Ranipet.
    Design,Manufacturing and Supply of Disconnecting Switch Variant.
  • M/s. Bharat Heavy Electricals Ltd., EDN, Bangalore.
    Design,Manufacturing and Supply of Modular Desk & Printer Table for NTPL, Tuticorin Project.
  • M/s. Alstom India Ltd., Noida, Uttar Pradesh.
    Design,Manufacturing and Supply of LIE/LIR for Bellary Project.
  • M/s. L&T - MHI Boilers Pvt. Ltd., Faridabad.
    Supply of Erection hardware and spares for Jaypee Nigrie Super Thermal Power Project (2 x 660 MW)
  • M/s. Tamil Nadu Newsprint and Papers Ltd., Kagithapuram.
    Design, Fabrication and Supply of SS Junction Box.
  • M/s. Bharat Heavy Electricals Ltd., EDN, Bangalore.
    Design, Manufacturing and Supply of LIE/LIR for Bela Nagpur (2 x 270 MW) TPP
  • M/s. Bharat Heavy Electricals Ltd., Tiruchirapalli.
    Design, Fabrication and Supply of Local Instrument Racks for Amaravathi and Nasik Projects.
  • M/s. ABB Ltd., Bangalore, Karnataka.
    Supply of LIE for WANAKBORI Project.
  • M/s. Emerson Process Management (I) Pvt. Ltd., Mumbai.
    Design, Engineering, Supply, Supervision of Installation & Commissioning, SAT and handing over of
    Local Instrument Enclosure & Local Instrument Rack for 2 x 660 MW (Unit - 3&4) LANCO Amarkantak
    Thermal Power Project, Amarkantak, Chattisgarh.
  • M/s. Bharat Heavy Electricals Ltd., Tiruchirapalli.
    Design, Fabrication and Supply of Local Instrument Enclosures  for Krishnapatnam Project.
  • DEPARTMENT OF SPACE, SHAR, SDSC, Sriharikota.
    Design, Fabrication and Supply of SOV Cubicles.
  • DEPARTMENT OF SPACE, SHAR, SDSC, Sriharikota.
    Design, Fabrication and Supply of Electric Drive Motors with Variable Frequency Drive's for Mill and Feed
    Drives of Micropulveriser System.
  • M/s. Bharat Heavy Electricals Ltd., Tiruchirapalli.
    Supply of spares for Scanner Air Fan DC Motor Starter Box for Sudan project.